Shandong Tianyu Machinery's Commercial Concrete Mixing Tower is equipped with the following key components:
1. Top storage bin (temporary storage) with five compartments for: stone (1.2m³), sand (1.2m³).
2. A dedicated temporary storage tank for clean water and admixtures, with wastewater recycled through pipelines to the weighing hopper.
3. Powder materials handled via screw conveyor system, featuring pneumatic butterfly valves at the outlet to ensure precise measurement accuracy.
4. All non-powder materials use gravity-based weighing method for high dynamic precision.
5. Aggregate materials processed through automated feeding system with 60 cubic meters/hour production capacity.
6. Air-pulse dust removal system combined with open feeding trough design creates internal airflow and negative pressure to prevent dust leakage, enabling dust collection and reuse.